Leon Building Services is committed to delivering excellence, reliability, and innovation across all construction services, supporting our clients in creating functional, inspiring, and sustainable environments. Take a look at some of our latest projects.
Education
Blessed Edward Oldcorne Catholic College, Worcester
An expert service from start to finish
Timeline for construction projects
This structured timeline ensures every phase of your project with Leon Building Services is managed efficiently, with a focus on quality, transparency, and client satisfaction from start to finish.
Step One
Initial enquiry /
Tender submission:
- Clients submit an initial enquiry or tender request.
- Leon Building Services reviews project requirements, budget, and timeline.
- We provide a detailed proposal.
Step Two
Awarding of Project:
- Upon project award, contracts are finalised, and Leon Building Services formally assumes responsibility as the principal contractor.
- A dedicated project manager is assigned to oversee the entire project and serve as the main point of contact for the client.
Step Three
Pre-Construction Phase
and Planning:
- Comprehensive project planning begins, including scheduling, resource allocation, and risk assessments.
- Detailed designs and construction plans are finalized in collaboration with architects and engineers.
- Health and safety measures, permits, and compliance requirements are arranged.
- Site preparations, including surveys and setup, are completed to ensure readiness for construction.
Step Four
Construction Period:
- Physical construction commences with Leon Building Services coordinating all site activities.
- Our team manages on-site work, including labour, materials, and logistics, to meet project milestones.
- Regular progress updates are provided to the client, ensuring transparency and adherence to timelines and budgets.
Step Five
Snagging and Handover:
- Upon completion, a snagging process is conducted to identify and rectify any minor issues.
- Project handover takes place, with comprehensive documentation and a walk-through for the client.
- Final quality checks and inspections are completed to ensure all work meets Leon Building Services’ and the clients standards.
Step Six
Subsequent Defects
Period:
- A formal defects liability period follows handover, during which any outstanding issues are addressed.
- Leon Building Services remains available for support, ensuring the client is fully satisfied with the completed project.











